Truck Tire Manufacturing Facility (South East USA) – 2017 Cost Basis:

This facility benchmark is for a greenfield Truck Tire Production facility. A number of new tire facilities & expansion projects are currently being constructed in the USA (the majority are located in TN, GA, NC & SC). This facility will produce 1.5 to 2 million tires per year when fully operational. Note (11), the manufacturing equipment below i.e. extruders, molders ovens etc, represents the largest cost component.

Utilizing Non-Union Labor: Detailed Design / Procurement Buyout 14 months. Construction 27 months: AACE Class 3 Funding Estimate

Excludes: Land Purchase, Owner Costs, and Front End (FEED) Studies