The Global Construction Newsletter for July to September 2021
Executive Summary:
Close to a year and half of dealing with COVID-19 has been a major challenge to all construction related organizations around the world.
COVID-19 has seen close to 170 million confirmed cases & close to 3 million deaths around the world. (Could be 7 million with some countries under-reporting) and over 600,000 deaths in the USA
The virus has created significant problems to the Global Construction sector, compelling many organizations to substantially modify, shut down or severely slow down ongoing construction activities. The world economy & construction sector is in its’ most unpredictable position since the Great Depression of the 1930’s. International economic growth has slowed down significantly.
The pandemic has negatively impacted the economies and construction sectors of more than 180 of the world’s 200 countries. Some counties have successfully navigated around the pandemic, while many countries have significantly struggled with the virus.
COVID-19 will be with us for the next year or two, don’t throw away your masks, some of the main challenges include:
- In the USA, over 70% of Contractors have experienced project delays & disruptions in the last 9 months.
- More than 80% of Contractors have suffered delays in obtaining domestic & international construction components.
- Over 75% of construction-related companies have suffered project cancellations, suspensions or major delays.
- A global recession is a distinct possibility in 2021 / 2022, look for inflation to move higher. Gasoline prices have increased in the US by 18% to 22% in the last 60 days.
- The USA has seen more than 600,000 deaths related to COVID.
- India has experienced more than 400,000 deaths (could be x 5 times more).
- Brazil has suffered more than 450,000 COVID-related deaths.
- Key construction materials (steel, copper, timber) are experiencing spiraling price increases, shortages & delivery to site delays brought on for the most part by COVID, the US housing boom and the Suez Canal snarl-up (MV Ever Given), these issues are causing increased construction cost & a rise in inflation across the world.
- There are some shortages of qualified workers in some countries (Welders / Instrument fitters etc.)
- Oil & Gas Projects will be less plentiful in 2021 (jury is still out)
- Looks like there will be more infrastructure projects.
- Generally, Commercial construction will struggle with an oversupply of offices & shopping malls (USA big problem – shopping online)
- Pent-up demand has caused huge price spikes to steel & OSB plywood & lumber products.
- The drawn-out & disorganized rollout of vaccinations is a serious problem in many countries. Europe has really struggled, but seems to be improving recently.
- COVID-19 could be around for another 1 to 2 or more years if distribution continues at its current rate.
- A new Indian variant of the novel coronavirus has shown up in around the world could be a problem?
- We have seen 2nd, 3rd and 4th waves of COVID-19, look for this to continue, for how long we just don’t know. Over 70% of Contractors have experienced project delays & disruptions in last 12 months.
However, we are starting to see signs the COVID-19 epidemic is starting to weaken, substantial headway has been made with the vaccine rollout and it appears that in North America economic recovery could be achieved in the next 3 to 6 months. However we are not out of the woods yet, another COVID 3rd wave could bring on an economic recession in the 2nd half of 2021. The construction sector continues to face headwinds as we transition into the 2nd half of 2021.
- New single family homes & apartment construction continues to remain extremely strong, we could see close to 1 million new home constructed in 2021, look for this blistering trend to cool down by the 4th Q of 2021.
- Commercial construction offices, hotels, shopping malls will continue to be sluggish, as this sector deals with working from home issues & shopping online.
- Infrastructure, renewable energy work looks to be well set for future Government investment.
- Manufacturing, Food, and Pharmaceutical related construction is expected to see reasonable growth in the 2nd half 2021.
- The recent jump in oil & gas price is good news for Engineering firms & Contractors. Oil, Gas & Petrochemical construction is forecast to have a positive growth period for the next couple of years, even with the recent cancellation of the Keystone Pipeline by the Biden Administration. The number of US drilling rigs have increase by more than 25% across all US Oil & Gas basins in the last 10 weeks.
Obviously, the 2nd half of 2021 is going to be a challenging year for the Global Construction industry, some counties especially in Asia have weathered the pandemic storm rather well.
Industrial Construction projects have seen a significant loss of worker productivity due to COVID mitigation programs.
Industrial Construction projects will on average take longer to accomplish, for example, a 12-month typical construction schedule will take anywhere from 14 to 15 months to complete post-COVID-19.
As we continue to transition into 2021, we are possibly moving into a new “normal” that still needs to be fully understood. We believe COVID-19 will have a major impact on how Construction Projects are bid, procured and executed in the foreseeable future.
We have been talking with a number of Construction Managers, Site Superintendents, Planners & Estimators in the last couple of months regarding the loss of productivity on specific trades due to COVID-19 on Industrial Construction projects currently being constructed in the USA & Canada:
This is the feedback we are getting: The majority of Refinery, Power, Manufacturing Pharmaceutical, Food Production & Owner companies are including clauses / contractual language in their construction contracts / Requests for Proposal (RFP’s) to minimize the spread of COVID-19 within their production sites. Most of these contractual requirements will impact construction productivity, they include:
We have carried out an Order of magnitude increase on a $20 to $30 million Industrial project that could be in $1.5 to $2 million range.
Current world political & economic risks & some positive issues facing the Global Construction Industry include:
- A 3rd wave of COVID-19 pandemic in Europe & other regions of the world appears to be a distinct possibility.
- The ongoing confrontational stance of China with India, Taiwan, Hong Kong, the USA & the countries bordering the South China Sea.
- The possibility of an all-out trade war between China and the US is still a possibility, as the US pins the blame of COVID-19 on China. It would appear entered a new Cold War between the US and China.
- Higher oil prices, US gasoline pump prices have increased by 33% in the last 3 months, is this a sign that inflation is about to kick in?
- North Korea continues to be a wild card, how will the new US administration deal with this problem?
- There remains a possibility of a prolonged Global Recession in the next 6 to 12 months.
- The loss of construction worker productivity on Industrial Construction projects related to social distancing, new safety rules & the need for personal protection, remain an issue.
If the majority of these concerns can be resolved or put to rest, then the Global Construction Industry has an excellent chance to grow & prosper in the next 2 to 5 years particularly in some of the 2nd & 3rd world developing economies of South East Asia, Africa & South America. However, the current global war on the COVID-19 needs to be won before this can be realized & this might take another year or two before this happens.
Things we will see in the 3rd Q of 2021:
USA, CANADA & MEXICO are forecast to see nominal GDP growth in the range of 3.5% to 4.8%:
The USA, Canada & Mexico are all slowly recovering from the pandemic.
In the USA, research of the impact of COVID-19 to project budgets & schedules related to industrial plant developments indicate that costs will increase by 5% to 10% from pre-COVID-19 levels.
The main reason we are seeing cost increases on Industrial Construction projects is due to the effect on direct and in-direct field construction labor caused by delays initiated by wearing PP all day, smaller crews, social distancing, cleaning routines, bussing, and site check-in routines.
The increased cost impact on a $25 million Industrial (200,000 man-hours) Project could be in the 5% to 7% range, without taking into account the significant spike in construction materials.
This will not be the case with Commercial / Residential type construction, we anticipate that this construction category will experience a minimal change in productivity, however, these facilities will be impacted by the increased costs by skyrocketing construction materials.
Increased construction materials prices is a major problem, brought on by pent up demand after the Covid slowdown and the current USA housing boom.
- Concrete (Ready Mix) + 5% in the last 8 weeks.
- Rebar + 15% to 45%% in the last 3 months.
- Formwork + 15% to 22% in the last 8 weeks.
- Bricks / Concrete Blocks + 7% in the last 10 weeks.
- Lumber / Plywood / OBS + 85% in last 3 months, we are seeing some prices starting to trend downwards.
- Pipe & Fittings (CS / SS) + 16% to 22% in the last 2 months.
- PVC Pipe & Fittings + 4% in the last 8 weeks.
- Copper materials / Electrical cable + 20% in the last 3 months.
There are indications that the COVID-19 epidemic is starting to wane, however we are not out of the woods yet, a 3rd COVID wave is a distinct possibility in certain US / Mexican states & Canadian provinces.
At least an additional 250,000 or more extra construction workers will be needed in the 2nd half of 2021, to keep pace with the booming single-family homes & apartment-related construction that is really resonating across the vast majority of US states. Extremely low mortgage rates, pent-up demand & a flight to the suburbs is fueling this housing expansion.
A full US economic recovery will take at least 6 to 12 months to return to pre-COVID-19 levels, the good news is that the economies of the USA, CANADA & MEXICO are starting to see growth as we move into 2nd half of 2021. In the USA, all of US States are now allowing construction work to proceed. Safety & worker protection has really become an important issue on construction sites in the last year.
Oil & Gas Owners / Operating Companies are taking a second look at their 2021 CAPEX budgets, with the recent strong rise in oil prices, a number of CAPEX-related Petro-Chemical, Energy & Power projects could move forward in the 3rd & 4th Q of 2021.
The majority of Refinery, Power, Manufacturing Pharmaceutical, Food Production & Owner related companies are including clauses / contractual language in their construction contracts / Requests for Proposal (RFP’s) to minimize the spread of COVID-19 within their production sites/campuses, most of these contractual requirements will impact construction productivity, they include:
• Utilizing social distancing 2 meter / 6 foot rules on construction site.
• Construction staff & workers are required to wear masks, in some cases gloves & goggles.
• Extensive cleaning measures / protocols required by Owners, some Owners are calling for dedicated COVID cleaning crews.
• Additional hiring of COVID mitigation/ testing site staff, requested by Owner.
• Increased field in-directs (Site Offices / Lunch – Change Areas & additional support labor).
• Smaller, spread out work crews, dictated by Owners.
• Required cool down breaks in morning & afternoon due to the permanent wearing of masks, gloves & safety glasses in high temperature locations.
Unfortunately, COVID has put a lot of small / mid-sized A/E’s, contractors, sub-contractors & vendors out of business, cash flow problems & lack of work is the reason for this situation.
The Canadian economy and construction sector was severely impacted by the COVID-19 virus, this and low oil demand / deteriorating oil prices. However, with the recent spike in oil prices is somewhat of good news for the Canadian oil patch.
The COVID-19 virus will hopefully fade away in the next 6 to 12 months, Canada is currently experiencing a housing boom, and the rest of the construction sector remain flat for the next 3 to 9 months.
Mexico has seen over 2 million confirmed COVID cases & 200,000 related deaths due to the virus, however recent reports indicated the number of deaths is closer to 350,000.
Like its two northern neighbors, the Mexican economy and construction sector struggled with the COVID-19 pandemic. This together with low oil prices in 2020 stymied the Mexican economy and construction sector. The COVID-19 pandemic will eventually be contained, this may take at least 6 months to achieve. $60 to $75 a barrel oil prices are forecast to in place in 2021, which is beneficial to the Mexican economy & its construction sector. A sustained economic recovery will take anywhere from 6 months to 12 months to achieve.
Western & Eastern Europe is forecast to see minimal or negative GDP growth in the 2nd half of 2021.
The protracted & disorganized rollout of vaccinations is a serious problem in many European countries. Europe experiencing 2nd & 3rd wave and COVID remains a serious problem and the new Indian strain presents additional challenges.
The UK has so far seen close to 4.3 million cases of COVID & more than 126,000 deaths. Germany has seen more than 2.7 million COVID cases, resulting in close to 75,000 fatalities. Spain has experienced more than 3.2 million confirmed cases of COVID & has lost close to 75,000 citizens.
Poland & the Czech Republic are dealing with a 3rd wave of COVID, other countries including Germany, Italy, Portugal & France continue to struggle with the COVID virus. L,ook for this to continue for the next 3 to 6 months. The European Union’s vaccination rollout is going so badly that both China & Russia are now approaching individual countries to sell their vaccines.
However, we are starting to see signs that the COVID-19 epidemic is starting to decline in the UK, Sweden, Norway & Denmark.
How the new Brexit trade agreement will impact European construction is still TBD, the UK & the European Union continue to squabble over the terms & conditions of the so called agreement, some industry experts believe the UK will benefit at the expense of both France and Germany.
The COVID-19 virus has negatively impacted the construction sectors of Germany, France, Italy, Spain & the UK – the latest thinking is that these construction sectors will start to see an improvement in the 2nd half of 2021.
Construction work has now gradually resumed on many construction sites across Europe. Industrial construction worker productivity is forecast to be reduced due to mandated social distancing and new safety rules.
In the UK, the housing sector is expected to weather the COVID-19 storm, however new retail construction, hotels and office construction will be in the doldrums for at least the next 12 to 18 months. Germany, France and Italy are expected to see a similar situation.
Lots of European construction related organization are looking future Government funded infrastructure investment in the next couple of months to help in weathering the downturn brought on by the pandemic.
A number European of large and mid-sized construction related organizations have reduced home office staff and site based positions, the current view is that this could amount to between 15% and 25% of current staff levels.
Sweden has been the only major European country not to impose a shut down or social distancing. Worker absence has been somewhat higher, delays of various construction materials have caused some delays, however at most it has been minor nuisance at a few construction sites. Recent reports from Sweden suggest in hindsight that lockdowns and social distancing should have been introduced like the vast majority of other countries.
The European construction sector has a reasonable chance to grow & succeed in the next 6 to 12 months & return to pre-COVID-19 levels if the virus vaccination program can be rapidly implemented to its 350 million citizens.
ASIA (Asian counties are projected to see a rebound in GDP growth in the 2nd half of 2021)
Asia Pacific is set to rebound in 2nd half of 2021, China will do well in the 2nd half of 2021, Malaysia experiencing a COVID spike, unfortunately India is experiencing a COVID tsunami (millions of casualties).
The major counties of Asia have weather the COVID storm rather well compared to its economic rivals the USA & Europe. China has seen 90,000 + confirmed cases of COVID & remarkably less than 5,000 deaths.
We are starting to see positive signs the COVID-19 epidemic is starting to decline in most Asian countries. China’s economy and construction sector has recovered rapidly, and rigorous lockdowns and population tracing policies checked the spread of the virus. The Chinese government also funded billions of dollars on future infrastructure projects.
Pre-COVID-19, almost a fifth of the world’s GDP originated out of China. The once buoyant Chinese economy slowed down rapidly in 2020. GDP growth in 2021 is forecast to be 6% to 7%.
China’s factories and production facilities are back in business as we transition into the 2nd Q of 2021. The Chinese economy & construction sector have experienced a growth spurt in the last 3 months.
Hong Kong may well present future challenges to China once COVID-19 has been resolved, social unrest does not appear to be waning. China has changed the one country, two systems previous approach, this could result in mass demonstrations and could stymie future construction & economic activity.
India now ranks # 5 in the economy league table, larger than both the UK & France. Look for 2021 GDP to be between 6% & 7% once the COVID virus is fully contained, which could take another 6 months. Unfortunately, the Indian economy has started to slow down rather rapidly in the last 3 months as a result of the COVID pandemic lockdowns. Infrastructure construction is the only good thing to report on at this time.
In general, the Asian construction sector dealt well with the effect of COVID-19 and is currently set to get beyond the last twelve difficult months. Most countries are starting to increasingly move forward again as we transition into the 2nd Q of 2021 with perhaps the exception of India.
Japan has weathered the COVID-19 reasonably well with just over 470,000 confirmed cases and close to 9,000 deaths. COVID-19 prompted the cancellation of the 2020 Olympics in Japan. The Summer Olympic Games will be held in mid-2021, however no spectators will be allowed into the various stadiums. Japans’ construction sector continues to experience minimal growth.
Vietnam successfully handled the pandemic crisis, with very few confirmed cases. Construction work never stopped during COVID-19.
Indonesia, South Korea, the Philippines, Cambodia, Bangladesh and Laos have all had COVID-19 issues, it appears they are dealing with the COVID-19 crisis relatively well. COVID-19 will regrettably impede some Asian economies and construction sectors somewhat in the 2nd Q of 2021, however recent indications from this region of the world is that the construction sector is starting to see some significant improvements.
AFRICA (African nations are set to see minimal or in some cases negative GDP growth in the 2nd half of 2021)
The African continent is still besieged with the COVID pandemic that will take many months to resolve.
The two largest economies in Africa, South Africa & Nigeria have been hard hit by COVID. South Africa has seen 1.5 + million confirmed cases of COVID & more than 50,000 deaths. Nigeria has seen close to 165,000 confirmed cases of COVID & more than 2,000 deaths.
The lengthy & shambolic rollout of vaccinations is a serious problem in many African nations that could take months to fully implement. Nevertheless, we are starting to see some positive signs the COVID-19 epidemic is starting to lessen. However, there remains a lot of challenges ahead in the 3 to 6 months.
South Africa is seeing a troubling new form of the COVID-19 virus which appears to be highly contagious. Many governments have banned travelers from South Africa from entering their countries.
Unfortunately, some countries in Africa lack the basic equipment or even trained health workers to respond to the COVID challenge, so the numbers of COVID cases could be questionable.
The African construction sector is dealing with the effect of COVID-19 and is presently lessening the impact, some counties never stopped construction activities and others completely closed down. Construction activities in most countries are starting to slowly move forward again as we transition into the 2nd Q of 2021.
The COVID-19 virus has been responsible for up to 50% of ongoing construction projects around the African continent to be closed down or delayed in the last 12 months, recent reports are that many of these closed down projects are starting construction activities again.
It appears that South Africa is now the epicenter of the African COVID-19 virus with more than 1.5 million confirmed cases & more than 50,000 deaths. Other counties such as Egypt, Nigeria, Ethiopia & Kenya have been hard-hit & there construction sectors will labor to move ahead in the 2nd half of 2021. There are concerns that future lockdowns will bring considerable suffering for the Africa’s deprived citizen, who lack basic services, without regular employment & lacking basic medical facilities to fall back on.
RUSSIA (Russia is forecast to see negative GDP growth in the 2nd half of 2021):
Russia has so far seen close to 4.5 million COVID cases & more than 100,000 casualties to the virus. The lengthy distribution of Russian vaccinations program continues to a problem. However, we are starting to see signs the COVID-19 epidemic is starting to weaken.
Russia announced in August 2020 that it had produced a COVID-19 vaccine (Sputnik COVID-19 vaccine, reported to be 95% effective). This vaccine went into full production in September 2020, Russia has been successful in selling this vaccine to a number of countries around the world, including Argentina, Belarus and a number of other countries.
The COVID-19 virus has been responsible for up to 40% to 60% of ongoing construction projects to be shut down or delayed, the projects that have continued to work have imposed rigorous safety and travel restrictions. The COVID-19 virus will influence future CAPEX projects and some projects will be cancelled.
Russia also continues to be vulnerable to US & Western European economic sanctions that will continue to suppress construction activity.
Oil prices have increased by more than 35% in the last 3 months, this is great news for the Russian economy & construction sectors. We are starting to see some positive signs the COVID-19 pandemic in Russia is starting to weaken as we move into the 2nd Q of 2021.
SOUTH AMERICA (South America is predicted to see zero or negative GDP growth for the 2ndhalf of 2021):
South America still struggling with the COVID pandemic, Brazil & Peru have really been hard hit.
South American construction activity & projects have for the most part gradually started to resume again. Peru, Ecuador, Guyana, Uruguay, Venezuela & Paraguay have unfortunately been severely impacted by the pandemic. In Brazil, construction work for the most part did not stop, however each region dealt with the crisis in different ways.
COVID appears to be getting worse in some South American countries. Brazil is seeing more than 4,000 COVID related deaths each day, with more than 12 million confirmed COVID cases & over 300,000 deaths. Brazil accounts for 25% of the world’s daily COVID-19 fatalities, many experts warn the worst may lie ahead.
Chile has seen close to 1 million COVID cases & more than 22,000 deaths so far, in spite of launching the world’s fastest COVID-19 vaccination campaign. Chile has been forced to announce strict new lockdowns as it plunges deeper into a relentless 2nd wave of COVID cases which is stretching the medical resources & intensive care capacity.
Argentina, Peru, Colombia & other South American nations have been hard hit in the last 12 months with the COVID pandemic, it could take more than 6 months until some relief is experienced.
COVID-19 in South America will be prevalent for at least the next 6 months to 12 months, it will hopefully slowly start to fade into the background by the end of 2021. The long-drawn-out & disjointed rollout of vaccination programs is a serious challenge in many South American countries that could take more than 6 months to see positive results.
South American construction activity & projects have for the most part gradually started to resume again. Peru, Ecuador, Guyana, Uruguay, Venezuela & Paraguay have unfortunately been severely impacted by the pandemic. In Brazil, construction work for the most part did not stop, however each region dealt with the crisis in different ways.
Look for South America’s construction sector to struggle for the 2nd Q of 2021. The COVID-19 virus will reduce future CAPEX spending for the foreseeable future, conceivably going well into 2021 and beyond. Many countries in South America lack intensive care units / isolation wards or adequate numbers trained specialist healthcare workers & advanced medical equipment & supplies to fight off the pandemic.
The jury is still out on the global economic impact of the COVID-19 Pandemic. Possibly, six months from now we will have a clearer understanding of how we get past this event & how it impacts the construction sectors of all the South American countries.
MIDDLE EAST (The Middle East countries will see nominal GDP growth in the 2nd half of 2021):
The Middle East is showing some improvement with mitigating the COVID virus, however it continues to be a significant problem.
The long-drawn-out & fragmented rollout of vaccination programs is a serious challenge in many Middle East countries that could take another 3 to 6 months to see positive results.
COVID cases in Saudi Arabia have risen to more than 500 a day, for the first time since October 2020. Absence of wearing face masks & social distancing is thought to be the main reasons. Saudi Arabia has seen more than 385,000 COVID cases that have resulted unfortunately to close to 7,000 casualties.
The UAE has seen 450,000 + confirmed COVID infections resulting in close to 1,450 people have perishing from the virus.
Marine traffic through the Suez Canal was blocked for more than a week, causing a traffic jam of more than 250 ships, carrying more than $10 billion of goods, many ships were rerouted around Africa increasing shipping / freight costs by as much as $150 million & causing significant delivery delays of goods & equipment.
The pandemic has caused uncertainty in the Middle East economies, construction has seen labor shortages & travel restrictions on 3rd world construction labor resources.
The impact of the pandemic in the Middle East will still be around for the next 3 to 6 months. The Middle East construction sector is still dealing with the aftereffects of COVID-19 and is currently trying to lessen the problem.
A few countries continued construction activity, while others either completely or partially closed down. Long lead equipment and bulk material delays and worker testing is still a challenge. Construction activities in most Middle-East countries are starting to gradually move forward again as we transition into the 2nd half of 2021.
Taking on new personnel / staff & construction workers from other countries remains a major challenge in many countries. Some countries are requesting workers from other countries to be quarantined for 14 days, the cost and logistics of this is significant. Delays in procurement / buy out of materials and equipment from countries such as China, Italy, France and the USA and the associated costs of mitigating these delays persists in being a problem. Extremely exacting safety measures have been introduced which will increase costs and negatively impact construction productivity. Many migrant construction workers returned to their home countries and are experiencing difficulties in retuning back to the Middle East.
The rising price & demand for oil could turn out to be a great boost for Middle East countries that could benefit future Oil & Gas construction projects.
Qatar, Jordan, Kuwait, Libya, the UAE & including Saudi Arabia are all in the same boat as many other countries. These countries are pronouncing new hygiene & travel restrictions, procedures & protocols as the number of Coronavirus infections keeps ramping up.
The pandemic has the potential for all Middle-East future or current ongoing construction projects to be delayed or worst case postponed. The economic impact and fallout of the Coronavirus still needs TBD as we transition into the 2nd half of 2021.
However, there is light at the end of the COVID tunnel, we are starting to see signs the COVID-19 epidemic is starting to weaken in some Middle East countries.
Australia & New Zealand combined will see nominal GDP growth in the 2nd half of 2021):
International bidding to procure construction materials has sent the cost of imported lumber, plywood, copper, rebar and other materials skyrocketing in both Australia and New Zealand.
Contractors are experiencing material shortages, delivery times on construction materials have increased from a normal 2 to 4 weeks to 4 to 8 weeks to arrive at site and even longer in some cases.
Australia & New Zealand, because of their remote location, have weathered the COVID pandemic remarkably well.
Australia’s economic relationship with China has seriously cooled down in the last 6 months, this issue is related to China’s South China Sea territorial claims that Australia is criticizing. This dispute will impact Australian mineral exports and could impact future mining related projects.
Australia is experiencing a housing / apartment / home remodeling surge similar to what the USA and Canada is undergoing.
We do expect a gradual & steady economic upturn as we transition into the 2nd half 2021 and the number of COVID-19 confirmed cases starts to significantly decline & travel restrictions are lifted.
COVID-19 has hindered CAPEX spending and delayed current construction projects in both countries. Australia and New Zealand in their two centuries of existence have never experienced an economic tsunami / earthquake of this scale. The Government of New Zealand is preparing to invest considerable funds on infrastructure / public works projects to minimize current and future unemployment.
2nd half of 20201 Construction Outlook for Major Countries:
Countries |
2nd half 2021 % GDP Growth |
2nd half 2021 Inflation % |
2nd half 2021 Unemployment % |
Comments on Construction in 2nd half of 2021 Future Spending Activity |
USA |
5.3 |
4.8 |
6.1 |
Increased construction materials prices is a major problem, brought on by pent up demand after the Covid slowdown and the current USA housing boom. Oil & Gas Owners / Operating Companies are taking a second look at their 2021 CAPEX budgets, with the recent strong rise in oil prices a number of CAPEX related Petro-Chemical, Energy & Power projects could move forward in the 3rd & 4th Q of 2021. The US construction sector tries to come to terms with the pandemic & the new normal. |
CANADA |
4.7 |
3.7 |
7.9 |
A slow advance in consumer and business confidence is expected in the 2nd half of 2021, look for the effects of COVID-19 to start to recede. Continuing higher oil prices will positively impact Canada’s oil patch. New RFQ’s / Bidding opportunities on commercial type projects should present themselves as we move further into 2021. |
BRAZIL |
4.1 |
6.7 |
14.8 |
Brazil continues to struggle with COVID related deaths each day, with more than 12 million confirmed COVID cases & over 300,000 deaths, Brazil accounts for 25% of the world’s daily COVID-19 fatalities, many experts warn the worst may lie ahead. |
UNITED KINGDOM |
3.8 |
1.2 |
5.2 |
BREXIT terms & conditions have finally been completed with a deal between the UK and EU. Once the COVID-19 pandemic is resolved, in say 3 to 6 months, the UK economy & construction sector could be set for a growth spurt. The pound sterling is starting to strengthen against the US Dollar. |
GERMANY |
2.8 |
1.6 |
4.6 |
The drawn-out & disorganized rollout of vaccinations is a serious problem in Germany. German economic & construction activity once the COVID-19 virus is alleviated is expected to improve, however this might take another 6 to 9 months. A lot of industry experts believe BREXIT will not be a good outcome for the German economy & construction sector, time will tell. |
FRANCE |
4.3 |
0.9 |
7.9 |
The drawn-out & confused rollout of COVID vaccinations is a serious problem in France. France & the rest of the EU have reached agreement on the terms of a deal on BREXIT. This could have ramifications on the French economy & construction sector. France has struggled with high unemployment since 2008. COVID-19 is an additional challenge. The full scale of the economic impact of the deadly COVID-19 on France is still TBD. This virus couldn’t have come at a worse time as France has struggled economically for the last 10 years. Engineering & Architectural firms are reporting a significant fall off of RFQ’s / new orders as we move into the 2nd half of 2021. |
RUSSIA |
3.4 |
5.1 |
5.1 |
Russia announced in August 2020 that it had produced a COVID-19 vaccine (Sputnik COVID-19 vaccine), that went into full production in September 2020. Russia is starting to see a 2nd wave of COVID-19 cases, it is currently reporting over 4.5 million confirmed cases & close 100,000 deaths. Russia has closed its borders to foreigners in recent weeks. The recent rise in oil prices is good news for the Russian construction sector. |
JAPAN |
2.3 |
0.9 |
2.7 |
Japan has withstood the COVID-19 reasonably well. The Japanese economy & construction sector is still underperforming. The cancelled 2020 Olympic games will move ahead in mid-2021, unfortunately without Olympic spectators in the stadiums. |
CHINA |
7.8 |
1.2 |
5.2 |
China’s economy and construction sector has recovered quickly, painstaking lockdowns and population tracing policies checked the spread of the COVID-19 virus The Chinese economy & construction sectors are starting see decent growth again. The consequences of the global economic impact of the deadly Coronavirus Pandemic is still TBD. Many US / European & Japanese manufacturing companies have plans to relocate their production facilities out of China, stay tuned. |
INDIA |
7.8 |
5.1 |
11.7 |
Unfortunately the Indian economy has started to slow down rather rapidly in the last 3 months as a result of the COVID pandemic lockdowns. Infrastructure construction is the only good thing to report on at this time. The potential of border hostilities with China is a major concern. India continues to purchase advanced fighter jets & weapon systems, which is not a good sign. India has been hard hit with COVID-19 resulting in many deaths. Prime Minister Narendra Modi has earmarked a $2 + billion fund to mitigate the effects of the Coronavirus Pandemic on the Indian population & industry. India now ranks # 5 in the economy league table, larger than both the UK & France, where will it be in the next 10 years? |
2nd Q 2021 Prices at a Glance:
- Forecast Cost of a barrel of Crude Oil $65 – $75
- Forecast of Euro / US $ Exchange Rate 1.17 – 1.24
- Forecast of UK Pound / US $ Exchange Rate $1.37 – $1.42
- Forecast of Copper per pound $4.35 – $4.65
- Forecast of Aluminum per pound $1.10 – $1.15
- Forecast of Gold per Ounce $1,850 – $2,100
- US Construction Material Inflation (Basket of 10 construction materials) 2.9% – 5.9%
Compass International is considered by many to be the global leader in providing construction cost data. We partner with many of our clients to train their staff on Conceptual & Detailed Estimating methods, Validate Estimates and to Turnaround problem CAPEX projects.
Eliminate the risk of cost overruns with Compass International’s researched and current US & International construction cost data.
Compass International’s staff of Estimators, Cost Engineers and Planners spend thousands of hours of construction costs research to develop our (8) construction cost data bases. In addition, we have a network of Construction Professionals / Consultants / Estimators located in more than 20 countries providing us with real time cost data, all of our data is supplemented with feedback from Project Control Professionals, Estimators, Q.S.’s, Architects, Engineers and Construction Managers around the world.
This comprehensive research supports us in validating our construction cost data library. Our updated construction cost data will assist you in your estimating / budgeting efforts, removing any concern of future construction cost overruns.
Our (8) 2021 Construction Cost Books & PDF’s are now available.
Visit our website http://www.compassinternational.net/
- To view our latest 2021 books http://www.compassinternational.net/books/
Compass International Consulting Services, we provide:
- Estimate Validation Services / Reviews of FEED Studies, AFE Budgets & Detailed Estimates for Owners that can save millions of CAPEX dollars. We also provide Independent Estimates / Check Estimates
- Benchmarking Services
- Global Market Surveys / Global Construction Cost Studies
- Turnarounds of Problem EPC / CAPEX Projects
- Optimizing CAPEX / OPEX Costs
To contact the Author of this newsletter or to enquire about our (8) Publications & Cost saving services, contact John G. McConville CCP – in USA call (609) 577 4505 or contact me on [email protected]