2025 Pipelines Mining & Offshore Cost Database

Compass International’s Pipelines Mining & Offshore Cost Database provides reliable/accurate early estimates of International Process Plants, Pipelines & Offshore related projects. This wide-ranging estimating database will be an invaluable tool for all construction professionals; it provides the reader with actual historical benchmarks of hard-to-find cost & material data.

Online Database format (1-2 Users) $465.00
Online Database format (3-5 Users) $745.00
Online Database format (6-10 Users) $1045.00

View Sample Data

Price range: $465.00 through $1,045.00

Description

  • International Location Factors
  • International VAT / GST Rates / International Import Duties
  • Detailed Design Benchmarks
  • Numerous Historical Benchmarks & Cost Models
  • Construction Labor Rates
  • General Requirements / General Conditions / Preliminaries /
  • Construction Equipment and Plant Site Construction / Concrete Work / Masonry / Piling
  • Structural Steel / Platforms
  • Electrical Equipment / Transformers / Cable / Control Wire / Conduit Cable Tray
  • Process Equipment / Major Equipment: Includes Agitators, Compressors, Condensers,
  • Conveyors, Cooling Towers, Heat Exchangers, Pumps, Tanks & much more
  • Instrumentation Devices and Controls Communications
  • Insulation, Painting, Coatings Refractory
  • Scaffolding
  • Global and International Freight
  • Offshore Construction Cost Data
  • Pipelines (Onshore and Offshore)
  • Module Cost Benchmarks
  • Wind Turbines (Onshore and Offshore) Benchmarks
  • Mining Benchmarks

ABOUT THE FIRM
ACKNOWLEDGEMENTS

1
SECTION 1:

  • Introduction, General Comments and Calibration Factors:
  • includes the following:
  • Location (Calibration) Factors – International values compared to USA Gulf Coast. (Base of 1.00). Calibrations in this application are used to adjust the benchmark prices depicted in the following SECTIONs (1 thru 700).
  • 25 # Country Calibration Factors.
  • General Conversion Values – Imperial to Metric Units.
  • Import Duties General Sales Tax / Value. Added Tax / Consumption Tax.
  • Detailed Design / Engineering / Architectural and CM Fees 51 # Facility Types.
  • Union Labor Costs / Inflation Cost Indexes.
  • USA and Canada State & Province Sales Tax / GST.

10
SECTION 10:

Major Equipment / Production Equipment

20
SECTION 20:

Site, Civil, Piling, Concrete, Masonry and Buildings

30
SECTION 30:

Structural Steel

40
SECTION 40:

Piping / (ISBL and OSBL)

50
SECTION 50:

Electrical and Instrumentation

60
SECTION 60:

Insulation

70
SECTION 70:

Painting and Coatings

80
SECTION 80:

Refractory

90
SECTION 90:

Scaffolding

100
SECTION 100:

Construction Equipment / Plant Hire

110
SECTION 110:

Domestic and International Freight

120
SECTION 120:

Offshore Data

130
SECTION 130:

Pipelines (Onshore and Offshore)

140
SECTION 140:

Module Cost and Man hour Benchmarks

150
SECTION 150:

Wind Turbines (Onshore and Offshore) Benchmarks

160
SECTION 160:

Mining Benchmarks

200
SECTION 200:

Home Office Engineering and Support Costs

300
SECTION 300:

Construction Management Cost Data

400
SECTION 400:

Temporary Site Facilities

500
SECTION 500:

All-in hourly labor rates

600
SECTION 600:

Insurance Data

700
SECTION 700:

Miscellaneous items, Bonds, Spare Parts, Camp Costs, Construction Consumables, Start up issues, Transmission Line Benchmarks and Camp Costs.