2026 Worldwide Industrial / Commercial Construction Schedule of Rates Database
This publication includes estimating data on the USA and 120+ countries / 700 cities.
| Online Database format (1-2 Users) | $435.00 |
| Online Database format (3-5 Users) | $715.00 |
| Online Database format (6-10 Users) | $995.00 |
Description
The 2026 Worldwide Industrial / Commercial Construction Schedule of Rates Database: This publication includes estimating data on the USA and 120+ countries & 700 worldwide cities this trusted cost data is applicable to industrial, process, power, high technology, commercial, and civil facilities and includes numerous facility cost models. This is a fast, accurate and reliable estimating tool that includes both metric and U.S. units of cost. Backed by 30+ years of international data collection, you can be sure that you're bid will be accurate.Save estimating time and money, this database has all the answers and data you need, take it with you to the job site and get the estimates, change orders and budgets finalized.
This is a fast, accurate and reliable estimating tool that includes both metric and U.S. units of cost. It is backed by 30+ years of international cost data collection, you can be sure that your estimate / bid will be accurate.
This valuable reference source contains the following (18) Construction Specifications:
- General Requirements / General Conditions / Preliminaries Division 1
- Site Construction
- Concrete Work (Excavation, Rebar, Formwork Concrete)
- Masonry / Brickwork
- Metals / Structural Steel / Platforms
- Framing, Wood and Plastics
- Thermal and Moisture Protection / Roofing
- Doors and Windows
- Finishes (Internal walls / ceilings etc.)
- Specialties
- Equipment
- Furnishings
- Special Construction
- Conveying Systems / Elevators
- Mechanical (Process Piping, Utilities, Plumbing, HVAC etc.)
- Electrical / Instrumentation / Controls
- Process Equipment / Major Equipment, (cost of equipment and setting)
- 100’s of Location Factors, Architectural, Engineering, Construction & Engineering Cost Benchmarks and Historical Cost Close Out Reports
This one of a kind , indispensable cost estimating tool allows Cost Estimators, Quantity Surveyors Planners, Facility Managers, Engineers, Architects & Project Managers to estimate / budget construction projects in more than 120 counties.
Table of Contents
2026 WORLDWIDE INDUSTRIAL / COMMERCIAL CONSTRUCTION SCHEDULE OF RATES DATABASE
0.1 Introduction and Calibration Factors
0.2 International Construction Implications
0.3 How to Use Location Factors
0.4 International Location (Calibration) Factors
0.5 Duties & Taxes
0.6 USA Location (Calibration) Factors
0.7 Detailed Design / Engineering / Architectural and C.M. Fees
0.8 USA & Canada Tax Info
0.9 Inflation / Cost Indexes
1.1 Division 01: General Requirements / General Conditions / Preliminaries
2.1 Division 02: Site Construction
3.1 Division 03: Concrete Work
4.1 Division 04: Masonry
5.1 Division 05: Metals
6.1 Division 06: Wood & Plastics
7.1 Division 07: Thermal & Moisture Protection
8.1 Division 08: Doors & Windows
9.1 Division 09: Finishes
10.1 Division 10: Specialties
11.1 Division 11: Equipment
12.1 Division 12: Furnishings
13.1 Division 13: Special Construction
14.1 Division 14: Conveying Systems
15.1 Division 15: Mechanical Work
16.1 Division 16: Electrical Work
17.1 Division 17: Process Equipment / Major Equipment
Related Products
2026 Front End/Conceptual Estimating Database