The Global Construction Newsletter
The 20 most expensive international cities to construct a 4 / 5 Star Hotel or Class “A” Office Building:
The average cost in Geneva Switzerland is $427 a Square Foot or $4,595 a Square Meter.
The cost in Singapore is $362 a Square Foot or $3,895 a Square Meter.
Cost Excludes Architectural / Engineering (Detailed Design, MEP Engineering, Structural Engineering, Construction Management Fees & F&F, that typical range between 13% & 19% & purchase cost of land:
-
Geneva – Switzerland
-
Zurich – Switzerland
-
London – UK
-
New York – USA
-
Oslo –Norway
-
San Francisco -USA
-
Copenhagen – Denmark
-
Stockholm – Sweden
-
Dubai – UAE
-
Hong Kong – China
-
Los Angeles – USA
-
Tokyo – Japan
-
Frankfurt – Germany
-
Sydney – Australia
-
Paris – France
-
Honolulu – USA
-
San Diego – USA
-
Toronto – Canada
-
Rome – Italy
-
Singapore – Republic of Singapore
For additional cities and Architectural / Construction Management Fee data refer to our latest 2021 Global Construction Yearbook / PDF’s that covers construction costs in 101 Countries,
To order books or to review the Table of Contents and a selection of sample pages click on the link below.