The 20 most expensive international cities to construct a 4 / 5 Star Hotel or Class “A” Office Building:
The average cost in Geneva Switzerland is $427 a Square Foot or $4,595 a Square Meter.
The cost in Singapore is $362 a Square Foot or $3,895 a Square Meter.
Cost Excludes Architectural / Engineering (Detailed Design, MEP Engineering, Structural Engineering, Construction Management Fees & F&F, that typical range between 13% & 19% & purchase cost of land:
- Geneva – Switzerland
- Zurich – Switzerland
- London – UK
- New York – USA
- Oslo –Norway
- San Francisco -USA
- Copenhagen – Denmark
- Stockholm – Sweden
- Dubai – UAE
- Hong Kong – China
- Los Angeles – USA
- Tokyo – Japan
- Frankfurt – Germany
- Sydney – Australia
- Paris – France
- Honolulu – USA
- San Diego – USA
- Toronto – Canada
- Rome – Italy
- Singapore – Republic of Singapore
For additional cities and Architectural / Construction Management Fee data refer to our latest 2021 Global Construction Yearbook / PDF’s that covers construction costs in 101 Countries,
To order books or to review the Table of Contents and a selection of sample pages click on the link below.